We are offering 5 complete sets of Siemens SGT-300-1S gas turbine generator packages, ideal for reliable and efficient power generation.
- 8MW gas turbine generator sets
- Qty: 5 units, skid-mounted packages
- 10-stage compressor, 2-stage turbine, DLE system
- Complete scope: generator, gearbox, controls, auxiliaries
- Reliable, low emissions
| No. | System Name | Specification of the Equipment | Qty | Unit |
| 1 | Gas Turbine Skid | SGT-300,8MW | 5 | set |
| 1.1 | Base Module | Steel construction Skid | 5 | set |
| 1.2 | Gas Turbine Core Engine | Including 10-stage compressor, 2-stage turbine, 6 DLE burners, annular combustion chamber with ignition bolt and flame monitoring, adjustable inlet guide vane, tilting pad thrust bearing, body fuel line, cooling and sealing air system, cylinder, chassis, body paint insulation, etc | 5 | set |
| 1.3 | Gear Box | Including main reduction gear, auxiliary gear, coupling, monitoring instrument, etc | 5 | set |
| 1.4 | Lube Oil System | Including main lubricating oil pump, auxiliary lubricating oil pump, accident lubricating oil pump, oil mist separation, lubricating oil filter, heater, cooler, temperature, liquid level, pressure monitoring instrument, oil tank, pipeline, etc | 5 | set |
| 1.5 | Start System | Including starting motor and hydraulic motor, etc | 5 | set |
| 1.6 | Gas Fuel System | Including flow control valve, filter, quick cut-off valve, release valve, monitoring instrument, etc | 5 | set |
| 2 | Generator | TFW8-4,8MWIncluding generator body, air water cooler, brushless excitation, temperature and vibration monitoring instrument | 5 | set |
| 3 | Air Intake System | Including rain cover, water mist separator, two-stage static filtration (G4+F9), inlet, silencer, expansion joint, platform aisle, monitoring instrument, etc | 5 | set |
| 4 | Enclosure and Ventilation System | Including open-air noise reduction cover, with lighting, ventilation fan, maintenance platform, baffle valve, etc | 5 | set |
| 5 | Exhaust System | Including body, insulation, expansion joint (with insulation), monitoring instrument, etc | 5 | set |
| 6 | Fire Fighting System | Temperature sensing probe, flame probe, infrared combustible gas detector, CO2 cylinder, nozzle, local cylinder room, connection pipe, etc | 5 | set |
| 7 | Compressor Washing Unit | Including water tank, diaphragm pump, low pressure water pipe, pressure gauge, etc | 2 | set |
| 8 | GT Control System | Including PCS7 control system, HMI operator station, disk-mounted emergency jump-off button, distributed I/O disk, etc | 5 | set |
| 9 | Special Tools | Including some installation, commissioning, maintenance tools | 1 | set |
| 10 | Spare Parts | 5 | set | |
| 11 | Drawings | Including factory certificate, drawings and operation and maintenance manual | 5 | set |
Contact Information
For technical data, full maintenance reports, or to schedule an inspection, please contact:
📧 Email: peter@turbineblade.net
📞 Phone: +8613544095201