The Frame 9E LEC combustion liner defines an inner combustion passage for the referenced LEC hardware family. Its head-end passages, larger wall ports and circumferential body features provide the geometry to be reviewed with the specified system connections.



| Item | Required definition |
|---|---|
| Reference family | Frame 9E |
| Combustion configuration | Frame 9E, LEC liner family; selected revision required |
| Component group | Combustion Liners |
| Geometry to define | Head-end passages, larger wall ports, circumferential features and retention details |
| Mating references | Specified Frame 9E LEC system connections |
| Material specification | Customer-defined grade and product form, confirmed during technical review |
| Manufacturing basis | Selected part drawing, revision and agreed acceptance requirements |
Keep the selected LEC revision attached to the liner enquiry. Review the head-end passages and larger wall ports together with the body features and retention details. Blaze uses the drawing and mating references to establish the proposed liner manufacturing and inspection scope.
For the Frame 9E LEC Combustion Liner, the wall construction, openings and end features determine the proposed manufacturing route. Blaze reviews the forming, joining and finishing requirements stated in the drawing package before confirming the selected work. Material grade, product form and dimensional acceptance requirements must be specified; a coating or additional test is included only when defined in the project scope.
This liner is identified by the LEC designation. Confirm the actual revision and assembly relationship instead of adding LEC III to the part specification without supporting documents.
Show the larger wall-port positions and dimensions together with the head-end passages and circumferential features. Include the retention details that relate the body to its connections.
Send the part drawing and revision, known part number, material specification, quantity and inspection requirements. State the selected LEC revision and include the larger wall-port and retention-feature details. If documentation is incomplete, include photographs and describe the available sample so Blaze can assess the next review step.
View Combustion Parts by Frame series
Frame and combustion-configuration names identify reference families. They do not establish OEM authorization or interchangeability. Fit is confirmed against the selected drawing revision and mating interfaces.